Multi-Million Ounce Deposit

Growing Gold Resources in Quebec’s Abitibi


Receive FREE Investor Deck:

Wallbridge Mining (TSX: WM | OTCQB: WLBMF) is tapping into the momentum of record-high gold prices with a positive PEA that positions its flagship Fenelon Gold Project as a scalable, long-life asset in Canada’s premier mining jurisdiction.

A mineral resource estimate was completed in 2025 that validated the multi-million-ounce potential of the 100%- owned Fenelon and Martiniere properties within an approximate 598 km2; exploration land package controlled by Wallbridge. The Company believes that these two deposits have excellent potential for economic development, especially given their proximity to existing hydro-electric power and transportation infrastructure. In addition, Wallbridge believes that the extensive land package is extremely prospective for the discovery of additional gold deposits.

DOWNLOAD INVESTOR DECK

The Wallbridge Advantage

investor_overview_icons-02-1_0x100.0x100

Multi-Million Ounce Mineral Resource Estimates

Fenelon
1.75 Moz Indicated 
1.65 Moz Inferred 

Martiniere 
346 Koz Indicated 
387 Koz Inferred

investor_overview_icons-03_0x100.0x100

598km2

District-scale
underexplored
land package

investor_overview_icons-05.0x100

Fenelon PEA

Annual Production: 107,000 Ounces
Annual Free Cash Flow: $120 Million
Total Cash Cost: $851 US$/Ounce
AISC: $1,046 US$/Ounce

investor_overview_icons-06.0x100

Exploration and Development

Martiniere
Focusing on defining broader footprint to gold system

Fenelon
Long-term platform for growth, positive PEA published March 2025, 16 Year Mine Life

DOWNLOAD INVESTOR DECK

Unlocking The Value of
FENELON GOLD PROJECT

Phase Years Activities
Pre-production Year 1 & 2 Infrastructure construction:
• Power line, camp expansion
• Mine site, mill plant, paste plant, tailing management site
• Water treatment

UG Development:
• Dewatering, main ramp, ventilation raise, stope preparation
Production via Ramp Year 1 to 15 Mining & Milling:
• Mining at 3,000 tpd
• Milling at 3,000 tpd

Infrastructure construction:
• Tailing management site expansion

UG Development:
• Main ramp, ventilation raise, and stope preparation
Ramp-down Year 15 to 16 Open-pit:
• Gabbro pit preparation (Year 15)
• Mining of the Gabbro pit (Year 16)

UG Development:
• Finishing the UG mine plan

Average production of 107,000 oz annually (127,000 in first 5 years)